Wednesday, March 9, 2016

Final update on previously mentioned projects.

Heads--are awesome.  No more pumping a handle 15 times to find that it didn't flush.  The build work that George did is fabulous and looks like it was always part of the boat. The man is a fiberglass god.

As I might have previously mentioned, the day head can also convert to be salt water, manual flush, so backup plan is in place.

Some experimenting with how the heads use up our fresh water supply (no water maker--yet), doing good, the holding tanks fill up before we make a dent in the water.  Not a problem if we are in open water, because we'll be set to pump and dump.






Fridge--We we first started the nonsense with the fridge (previous post) , we thought it was not enough refrigerant.  So after a while with the new (and most awesome) thermostat, we called the guy that runs the service department at the marina, sure enough, needed refrigerant.  So he charges it and also shows us how to charge it ourselves.  YAY.

Now--now we have a fridge and freezer that works TOO well, as our last trip testified with frozen stuff in the fridge.  When we are on the hook it helps to place a towel over our fridge to help with condensation, but those suckers work with authority now.

No comments:

Post a Comment